Natural daylight replaces artificial lighting. Mechanical joint survives vibration and monsoon indefinitely.
Public infrastructure should be daylit. A covered walkway or underpass that relies on artificial lighting during the day is both an energy cost and a quality-of-life failure. Polycarbonate vault canopies solve both problems — replacing artificial lighting with diffuse, even natural illumination while providing weather protection with minimal sealant maintenance.
Coxwell has delivered covered walkway and underpass infrastructure across Delhi, Mumbai, Uttar Pradesh, Maharashtra, Chhattisgarh, and more — for CPWD, PWD, Indian Railways, NCRTC, and Delhi Metro.
| Feature | Polycarbonate | Glass | Metal roofing |
|---|---|---|---|
| Daylighting | ✓ Diffuse, eliminates artificial lighting | ✓ With glare and heat | ✗ None |
| Weight | 1.5–4.5 kg/m² | 10–25 kg/m² | 4–8 kg/m² |
| Vibration tolerance | High — flexible | Low — sealant fails | Moderate |
| Maintenance | None — no sealant joints | Seal maintenance | Annual painting |
| Curved profiles | Yes — vault, eye-shape | Specialist only | Limited |
| Gov. specification | CPWD, PWD, Railway, Metro approved | Specialist | Standard |
Vault and eye-shape profiles are Coxwell's most common walkway specification. The double-tooth interlocking mechanical joint handles vibration loading from pedestrian traffic, road traffic, and rail vibration without sealant failure. Specified on Delhi Metro, NCRTC Meerut, and multiple PWD underpass projects.
Specify Multicell →Specifying polycarbonate for walkways and underpasses
5,239 m² · Multicell 14mm Clear · Vault and eye-shape · 2025. Covering Delhi's busiest transit interchange. No supplementary daytime lighting required.
View project →6,755 m² · Multicell 16mm Opal · Vault · 2023. PWD Delhi. High-traffic urban underpass — mechanical joint handles road vibration.
View project →3,000 m² · Multicell 16mm Ice · Vault · 2023. PWD Delhi. Central Delhi urban infrastructure.
View project →Share your walkway dimensions, structure type, and specification requirements. Engineering response within 48 hours.
Get a walkway quote →