The primary goal of the client was to reduce heat inside the building, minimize HVAC costs and maximize the LEED ratings. The structure was a hybrid of a pyramid and a vault.
The project included fabricating two domes with varying heights (15 meters and 26 meters). The project was completed in a mere 30 days, while maintaining the quality and integrity of the domes.