Case Studies
Case Studies
Pathways School Gurugram

The primary goal of the client was to reduce heat inside the building, minimize HVAC costs and maximize the LEED ratings. The structure was a hybrid of a pyramid and a vault.

Read more

New High Court Campus, Ranchi, Jharkhand

The project included fabricating two domes with varying heights (15 meters and 26 meters). The project was completed in a mere 30 days, while maintaining the quality and integrity of the domes.

Read more

Send a Query